- Power
- 2,200 MW est.
- Water
- 15 million L/day est.
Loudoun County, Virginia
Ashburn, Deep Focus
Settle in among the largest concentration of data centers on Earth.
Synthesized. Not a real recording.
- Power
- 2,200 MW est.
- Dominion Energy reported a 2022 data center peak of 2,767 MW in its territory and said Loudoun County is over 80% of that demand. The figure shown is that 80% share.
- Dominion Energy, 2023
- Water
- 15 million L/day est.
- About 4 million gallons a day of average consumptive use by data centers in the Washington metro area in 2025, most of them in Loudoun County. Peak days reach about 15 million gallons.
- Interstate Commission on the Potomac River Basin, 2026
Since you pressed play
- Electricity
- 0.0 kWh at the reported peak
- Water
- 0.0 liters of water
After less than a minute of listening, at the rates above. The power figure is an upper bound, not measured use. Based on estimates.
- Operator
- Many operators
- Status
- Operating
After a power failure in July 2026, neighbors of a data center campus in Sterling told the county about a constant hum at all hours, and then the diesel generators.
Captions
- Loudoun County counted about 233 data center buildings, built or under construction, as of March 2026.
- Together they cover roughly 56.5 million square feet.
- In 2022, data centers in Dominion Energy's territory reached a peak demand of 2,767 megawatts.
- Dominion says the industry here is concentrated in roughly 30 square miles.
- On an average day, data centers account for 9% of Loudoun's drinking water use.
- About 40% of the region's data centers are cooled by air alone.
- Data center taxes paid for 39% of the county budget in fiscal 2026.
The scene
Drawn from Amazon Web Services Smith Switch Road campus (IAD50, IAD60, IAD71), Ashburn, Virginia. Building outlines, fuel tanks and fence from OpenStreetMap; heights, colors and the transformers in the substation are estimates, and the generators are not drawn because their places are not mapped.
Sources
- Dominion Energy, Data Center Forecasting, presentation to PJM, June 2023
- Interstate Commission on the Potomac River Basin, Data Centers and Water Use in the Potomac River Basin, March 2026
- Loudoun County, Data Centers: The Loudoun Story
- Loudoun County, Data Centers: Water Considerations
- WJLA, Data center noise, fumes create flood of complaints in Loudoun County, July 2026